广州森辰驰机械设备有限公司


产品搜索:  
您现在的位置:网站首页 > 产品展示
产品展示
  • 超声波多针打孔机
  • 部件说明

    ①升降手柄 lift lever
    ②喇叭头 flared head
    ③针头 syringe needle
    ④水管 water pipe
    ⑤重力杆 gravity lever
    ⑥过载指示灯 overload light
    ⑦工作指示灯 work indicating lamp
    ⑧超声波功率调节 ultrasonic power regulation
    ⑨超声波开关 ultrasonic switch
    ⑩电源开关 power switch
    ⑪超声波电流表 ultrasonic current meter
    ⑫音波调节 sonic regulation
    ⑬水泵 water pump
     
    产品技术参数
    品 名:超声波多针打孔机
    参 数:
    输入电压:AC 220V
    输出功率:2000W
    外观尺寸:长54cm×宽50cm×高150cm(±2cm)
     
    Product's Technical Parameters
    Name:Ultrasonic spininess perforating machine
    Arguments:
    U:AC 220V
    P:2000W
    Size: 54cm(L)×50cm(W)×150cm(H)(±2cm)
     
    操作说明
    一、将机头线、风扇线、水泵线、电源线插入主机后方对应位置;将打孔针焊接在③针头上;
    二、将③针头和②喇叭头连接,锁紧;
    三、将圆珠放入③针头下方的升降台上,对准;
    四、将⑤重力杆调节至适当重力,放开;
    五、打开⑩电源开关;
    六、打开⑬水泵开关;
    七、调节⑧超声波功率调节至所需位置;
    八、打开⑨超声波开关;
    九、调节⑫音波调节至适当位置,⑥过载指示灯熄灭,表示正常工作;
    十、水泵电机部分请注意防水;
    十一、水桶水位距水桶上沿5cm,不能过满。
    十二、金刚砂加入3~4kg。
    Operating instructions
    1. To the handpiece wire, the fan wire, water pump wire, the power wire inserted into the mainframe corresponding position; weld holing needle on ③syringe needles;
    2. Connect ②flared head ③ syringe needle, lock;
    3. Put round bead at the bottom of the lifting platform under ③syringe needle, alignment;
    4. To adjust ⑤gravity lever to proper gravity, let go;
    5. Open ⑩the power switch;
    6. Open ⑬ water pump switch;
    7. Adjust ⑧ultrasonic power regulation to the in place;
    8. Open ⑨ultrasonic switch;
    9. Regulate ⑫sonic regulation to the in place, ⑥overload light go out; proper functioning;
    10.             Please note waterproof water pump motor parts.
    11.             The water level along the 5 cm away from the bucket, bucket can't too full.
    12.             Add emery 3 ~ 4 kg.
     


    注意事项:
    1、设备用电必经漏电开关!!!
    2、使用设备前必须接地!!!
          4、请您在使用本机前,认真阅读使用说明和注意事项。
     
    Note:
    1, The equipment must be pass through the leakage switch!!!!!!!!!!!
    2, Before using equipment must be grounded!!!!!!!!!!!
    3, If fault, cannot be not tear down by yourself, should be a professional inspection, should be handled by professionals to check!!!!!!!!!!!
    4, please before using the machine, read the instructions and matters needing attention.
    5, before use, please check whether the power supply you use is consistent with the machine, to ensure good grounding device.
  • [返回]